Carrapateena mine of Oz Minerals being taken over by BHP
A similar ore body to Havieron and roughly the same cover depth.
This break through was announced this morning.
I’m presuming it’s from the sub level caving operation which is above the bulk cave.
The Decline is similar to Havieron as well, notice the conveyor layout.
They advanced their Decline far quicker than ours, ground structurally better.
With the Havieron plan changed from SLC to SLOS the backfilling with paste fill may mean Havieron doesn’t breach the surface just leaving underground chambers.
Breaching the surface with ground conditions as at Havieron may lead to large water ingress and slumping of the cover into the workings, so leaving the surface intact maybe what the mining plan is trying to achieve.
We will have to wait and see